RoleFalcon
All jobsIT jobsBrowseCompaniesBlog
English
Pittsburgh, PA

Construction Scheduler | Mission Critical

Salary: unknownOperations and admin

Pay vs market

Salary: unknown

USD 90K
Market median of 2,158 jobs
Salaries for this role

The company

Sargent Electric
Energy and climate
7-71% in 30 days
open positions
All open jobs at Sargent Electric

Where to apply

Use the button above. It opens the posting on the employer's site.

Checked 30 h ago

About the job

Sargent Electric, a company in energy and climate, is hiring for the role of Construction Scheduler | Mission Critical. The job is based in Pittsburgh, United States. We classify it under operations and admin. Sargent Electric has 7 open positions on this site, 1 of them in IT and engineering.

Posted 27 days ago · Last checked 2026-11-28

About Sargent Electric

Energy and climateNon-tech company with an IT team

7 open positions, 14% in IT and engineering. Most open roles: Operations and admin (2), Non-software engineering and technicians (1), Project and program management (1).

Similar jobs

Key facts

WorkplaceWorkplace not stated
SeniorityNot stated
RoleOperations and admin
CountriesUnited States
Employment typeFULL_TIME

The full description is on the original posting. Labels are set automatically and can be wrong. About the data