RoleFalcon
All jobsIT jobsBrowseCompanies
English

← back to results

Accenture Construct – Project Manager, Data Center Construction, ANS

Salary: unknownHybridMidSkilled trades, construction and production
Change managementProcurementMS Project

Accenture Infrastructure and Capital Projects, LLC, a company in energy and climate, has an open position for Accenture Construct – Project Manager, Data Center Construction, ANS. It is a hybrid position in Ans, Belgium. We classify it as a mid-level role in skilled trades, construction and production. Candidates need 4+ years of experience. The role includes some travel. A university degree is required. There are 40 open positions from Accenture Infrastructure and Capital Projects, LLC on this site, 1 of them in IT and engineering.

Posted 8 days ago · Last checked 2026-10-31

About Accenture Infrastructure and Capital Projects, LLC

Energy and climate Non-tech company with an IT team 40 open positions, 2% in IT and engineering. Most open roles: Skilled trades, construction and production (12), Non-software engineering and technicians (8), General management and executives (8).

All open jobs at Accenture Infrastructure and Capital Projects, LLC →

Similar jobs

QC Analyst Talent PoolLegend Biotech EU · BelgiumOn-siteProduction OperatorSmappee · Harelbeke, Flanders, BelgiumServicetechniker SHK (m/w/d) Wärmepumpen & Heiztechnik - 1KOMMA5° Handwerk - Deutschlandweit1KOMMA5 · Remote | Hamburg | Berlin | Bremen (Remote) | Remscheid | Lüneburg | Göttingen | Lingen | München | Spanien | Münster | Hildesheim | Hamburg Remote | Region Stuttgart | Frankfurt am Main | Magdeburg | Düsseldorf | Riederich | Landshut | Köln | Heidelberg | Brandenburg (Remote) | Moers | Neukirchen-Vluyn | Oberhausen | Marburg | Potsdam | Nürnberg | Rostock | Leipzig | Karlsruhe | Mainz | Ulm | Heilbronn | Saarbrücken | Seevetal | Kierspe | Trier | Malmö | Sachsen (Remote) | Baden-Württemberg (Remote) | Hessen (Remote) | Mecklenburg-Vorpommern (Remote) | Niedersachsen (Remote) | Nordrhein-Westfalen (Remote) | Rheinland-Pfalz (Remote) | Saarland (Remote) | Sachsen-Anhalt (Remote) | Schleswig-Holstein (Remote) | Thüringen (Remote) | Bayern (Remote) | Ingolstadt | Kiel | Fulda | Schwäbisch Gmünd | Kempten im Allgäu | Meppen | Freiburg | Dresden | Würzburg | Bayreuth | Pforzheim | Weimar | Flensburg | Region Berlin Brandenburg | Hannover | Breidenbach | Region Wetzlar | Region Gießen | Bamberg | Uedem | Koblenz | Zwickau | Chemnitz | Gera | Stockholm | Augsburg | Konstanz | Regensburg | Kaiserslautern | Niedersachsen | Baden-Württemberg | Region Göppingen | Region Böblingen | Region Hechingen | Region Nagold | Region Hagen | Region Solingen | Region Leverkusen | Region Uelzen | Region Bad Bevensen | Region Lüchow | Region Dannenberg | Region Salzwedel | Ostdeutschland (Remote) | Erding | Freising | Pfaffenhofen an der Ilm | Dachau | Germering | Wolfratshausen | Ebersberg | Petershausen | Moosburg an der Isar | Wasserburg am Inn | Tegernsee | Mühldorf am Inn | Murnau am Staffelsee | Holzkirchen | Prien am Chiemsee | Herrsching am Ammersee | Starnberg | Weilheim | Rosenheim | Deggendorf | Aachen | Riesa | Wittenberg | Freiberg | Norddeutschland (Remote) | Süddeutschland (Remote) | Heidenheim an der Brenz | Memmingen | Neuburg an der Donau | Landsberg am Lech | Königsbrunn | Günzburg | Donauwörth | Nördlingen | Braunschweig | Wolfsburg | Villingen-Schwenningen | Deventer | Ettenheim | Offenburg | Waren an der Müritz | Wismar | Hagenow Land | Thüringen | Ludwigsburg | Reutlingen | Metzingen | Filderstadt | Tübingen | Schwäbisch Hall | Künzelsau | Crailsheim | Öhringen | Bietigheim-Bissingen | Backnang | Schorndorf | Besigheim | Vaihingen | Kirchheim | Stockach | Friedrichshafen | Überlingen | Pfullendorf | Göppingen | Geislingen | Tuttlingen | Rottweil | Sankt Georgen | Donaueschingen | Lörrach | Mosbach | Eppingen | Gundelsheim | Obersulm | Mannheim | Ludwigshafen | Rothenburg ob der Tauber | Neustadt an der Weinstraße | Landau in der Pfalz | Idar-Oberstein | Bielefeld | 1KOMMA5° Dortmund | Wittstock Dosse | Röbel | Malchow | Plau am See | Templin | Güstrow | Cloppenburg | Dortmund | Essen | Bochum | Paderborn | Osnabrück | Mülheim | Möhnesee | Kassel | Cottbus | Berlin (Remote) | Neubrandenburg | Passau | Kempten | Meißen | Mönchengladbach | Annaberg-Buchholz | Halle (Saale) | Erfurt | Jena | Rastatt | Baden-Baden | Bruchsal | Bretten | Bad Liebenzell | Brackenheim | Lindern | Fürth | Erlangen | Lauf an der Pegnitz | Herzogenaurach | Roth | Neumarkt in der Oberpfalz | Amberg | Uckermark | Frankfurt Oder | Bremen | Oldenburg | Bodensee | Schweinfurt | Kitzingen | Bad Kissingen | Neustadt an der Aisch | Kaisheim | Feuchtwangen | Harz | Holzminden | Höxter | Northeim | Wernigerode | Deutschlandweit | Ettlingen | Wiesbaden | Darmstadt | Flöhrsheim | Salzgitter | Peine | Wolfenbüttel | Bremerhaven | Kolbermoor | Mülheim a. d. Ruhr | Bocholt | Neumünster | Sigmaringen | Tangstedt | Brüssel | Euskirchen | Stralsund | Rügen | Grimmen | Ribnitz-Damgarten | Erkrath | Dänemark (Remote) | Coburg | Emmendingen | Saarlouis | Merzig | Homburg | Neunkirchen | Balingen | SingenRemote
WorkplaceHybrid
SeniorityMid
RoleSkilled trades, construction and production
CountriesBelgium
Employment typefull-time
Key factsExperience: 4+ years · Degree required · Some travel

The full description is on the original posting. Labels are set automatically and can be wrong. About the data