Accenture Construct - Data Center Construction Project Manager - Brazil, ANS
Accenture Infrastructure and Capital Projects, LLC, a company in energy and climate, is hiring for the role of Accenture Construct - Data Center Construction Project Manager - Brazil, ANS. The work is on-site in Campinas, Brazil. We classify it as a senior-level role in skilled trades, construction and production. Candidates need 7+ years of experience. There are 40 open positions from Accenture Infrastructure and Capital Projects, LLC on this site, 1 of them in IT and engineering.
Posted 10 days ago · Last checked 2026-10-31
About Accenture Infrastructure and Capital Projects, LLC
Energy and climate Non-tech company with an IT team 40 open positions, 2% in IT and engineering. Most open roles: Skilled trades, construction and production (12), Non-software engineering and technicians (8), General management and executives (8).
All open jobs at Accenture Infrastructure and Capital Projects, LLC →
Similar jobs
| Workplace | On-site |
| Seniority | Senior |
| Role | Skilled trades, construction and production |
| Countries | Brazil |
| Employment type | full-time |
| Key facts | Experience: 7+ years |
The full description is on the original posting. Labels are set automatically and can be wrong. About the data