RoleFalcon
All jobsIT jobsBrowseCompanies
English

← back to results

Phoenix, Arizona, United States

CONSTRUCTION SCHEDULER

Salary: unknownExcelProcurement

CONSTRUCTION SCHEDULER is an open role at Nox Group, a company in manufacturing and hardware. The job is based in Phoenix, United States. We classify it under operations and admin. Nox Group has 16 open positions on this site, 1 of them in IT and engineering.

Posted today · Last checked 2026-10-26

About Nox Group

Manufacturing and hardware Non-tech company 16 open positions, 6% in IT and engineering. Most open roles: Non-software engineering and technicians (4), General management and executives (4), People / HR / recruiting (2).

All open jobs at Nox Group →

Similar jobs

WorkplaceWorkplace not stated
SeniorityNot stated
RoleOperations and admin
CountriesUnited States
Key factsTools: Excel

The full description is on the original posting. Labels are set automatically and can be wrong. About the data