RoleFalconAll jobsIT jobsBrowseCompaniesUpdated 5 min agoSign in

← back to results

Abernathy, TX; Amarillo, TX; Dallas, TX; Dallas-Fort Worth, TX; Fort Worth, TX; Garland, TX; Houston, TX; Plainview, TX; San Antonio, TX; Waco,TX; Wichita Falls, TX

Superintendent- HVAC (Onsite-Abernathy Texas/Data Center Construction)

Salary: unknownOn-siteHVACLockout/tagoutOSHAHeavy equipment

Mullins Mechanical, a company in manufacturing and hardware, has an open position for Superintendent- HVAC (Onsite-Abernathy Texas/Data Center Construction). The role is on-site in Amarillo, United States. We classify it under skilled trades, construction and production. The role includes some travel. Mullins Mechanical has 37 open positions on this site.

Posted 20 days ago · Last checked 2026-10-21

About Mullins Mechanical

Manufacturing and hardware Non-tech company 37 open positions. Most open roles: Non-software engineering and technicians (14), Skilled trades, construction and production (10), Security guards and safety (9).

All open jobs at Mullins Mechanical →

Similar jobs

1,908 open skilled trades, construction and production jobs in the United States

WorkplaceOn-site
SeniorityNot stated
RoleSkilled trades, construction and production
CountriesUnited States
Key factsSome travel

The full description is on the original posting. Labels are set automatically and can be wrong. About the data