Superintendent- HVAC - Data Center Construction (Onsite-Abernathy Texas/Data Center Construction)
Mullins Mechanical, a company in manufacturing and hardware, is hiring for the role of Superintendent- HVAC - Data Center Construction (Onsite-Abernathy Texas/Data Center Construction). The work is on-site in Amarillo, United States. We classify it under skilled trades, construction and production. The role includes some travel. There are 37 open positions from Mullins Mechanical on this site.
Posted 20 days ago · Last checked 2026-10-21
About Mullins Mechanical
Manufacturing and hardware Non-tech company 37 open positions. Most open roles: Non-software engineering and technicians (14), Skilled trades, construction and production (10), Security guards and safety (9).
Similar jobs
1,910 open skilled trades, construction and production jobs in the United States
- Production II-Overnight — SanMar-Internal , Robbinsville, NJ
- Production Coordinator II — Rocket Lab Corporation, Long Beach, CA
- Shift Lead — Story Cannabis, Lake Havasu, AZ
- Senior Automotive Painter - Chandler, AZ ($6000 Bonus) — Carvana, Chandler, AZ
- Global Supply Manager, Capital Equipment & Construction (Starship) — SpaceX, Starbase, TX
- Car Detailer Louisville VM FT — Carvana, Louisville, Kentucky, United States
- Packaging Architect — OLIX, Austin, TX | London, UK | Bristol, UK
- Residential Plumbing Installer — Fetch-A-Tech, Las Vegas, NV
| Workplace | On-site |
| Seniority | Not stated |
| Role | Skilled trades, construction and production |
| Countries | United States |
| Key facts | Some travel |
The full description is on the original posting. Labels are set automatically and can be wrong. About the data