Precision for Medicine, a company in biotech, pharma and medtech, has an open position for Change Order Manager. The role is remote, and the posting gives Brazil, Colombia and Mexico as the location. We classify it as a senior-level role. It asks for 5+ years of experience. Visa sponsorship is not offered. The role includes some travel. Precision for Medicine has 36 open positions on this site, 2 of them in IT and engineering.
Posted 12 days ago · Last checked 2026-10-20
About Precision for Medicine
Biotech, pharma and medtech Non-tech company with an IT team 36 open positions, 6% in IT and engineering. Most open roles: Healthcare and social care (25), Non-software engineering and technicians (3), Data and machine learning (2).
| Workplace | Remote |
| Seniority | Senior |
| Role | Other |
| Countries | Brazil, Colombia, Mexico |
| Key facts | Tools: Excel · Experience: 5+ years · Remote · Visa sponsorship: no · Some travel |
The full description is on the original posting. Labels are set automatically and can be wrong. About the data