Senior Construction Manager - Data Center Construction
Senior Construction Manager - Data Center Construction is an open role at CoreWeave, a software company in developer tools and infrastructure. The posting gives West Chicago, United States as the location. We classify it as a senior-level role in skilled trades, construction and production. Candidates need 7+ years of experience. A university degree is required. Certifications named in the posting: PMP. There are 86 open positions from CoreWeave on this site, 29 of them in IT and engineering.
Posted 29 days ago · Last checked 2026-10-21
About CoreWeave
Developer tools and infrastructure Software product company 86 open positions, 34% in IT and engineering. Most open roles: Finance and legal (20), Software engineering (general) (19), Non-software engineering and technicians (11).
Similar jobs
1,909 open skilled trades, construction and production jobs in the United States
- Production Coordinator II — Rocket Lab Corporation, Long Beach, CA
- Shift Lead — Story Cannabis, Lake Havasu, AZ
- Senior Automotive Painter - Chandler, AZ ($6000 Bonus) — Carvana, Chandler, AZ
- Global Supply Manager, Capital Equipment & Construction (Starship) — SpaceX, Starbase, TX
- Car Detailer Louisville VM FT — Carvana, Louisville, Kentucky, United States
- Packaging Architect — OLIX, Austin, TX | London, UK | Bristol, UK
- Residential Plumbing Installer — Fetch-A-Tech, Las Vegas, NV
- Commercial Fire Door Inspector II — DH Pace, Port St. Lucie FL
| Workplace | Workplace not stated |
| Seniority | Senior |
| Role | Skilled trades, construction and production |
| Countries | United States |
| Key facts | Experience: 7+ years · Degree required · Certifications: PMP · Driving licence required |
The full description is on the original posting. Labels are set automatically and can be wrong. About the data