RoleFalcon
All jobsIT jobsBrowseCompaniesBlog
English
Memphis, TN

Construction Scheduler - Mobile Construction

Salary: unknownMidOperations and admin

Pay vs market

Salary: unknown

USD 82.5K
Market median of 389 jobs
Salaries for this role

The company

SpaceX
Aerospace and defense
756+66% in 30 days
open positions
All open jobs at SpaceX

Where to apply

Use the button above. It opens the posting on the employer's site.

Checked 46 min ago

About the job

Construction Scheduler - Mobile Construction is an open role at SpaceX, a company in aerospace and defense. The job is based in Memphis, United States. Our labels mark it as a mid-level role in operations and admin. It asks for 4+ years of experience. Certifications named in the posting: PMP. SpaceX has 756 open positions on this site, 178 of them in IT and engineering.

Posted today · Last checked 2026-11-30

Tech stack

About SpaceX

Aerospace and defenseNon-tech company with an IT team

756 open positions, 24% in IT and engineering. Most open roles: Non-software engineering and technicians (279), Software engineering (general) (161), Operations and admin (136).

Similar jobs

Key facts

WorkplaceWorkplace not stated
SeniorityMid
RoleOperations and admin
CountriesUnited States
Key factsTools: Power BI · Experience: 4+ years · Certifications: PMP · Schedule: shift work, night shifts

The full description is on the original posting. Labels are set automatically and can be wrong. About the data