Senior Cost Manager / Quantity Surveyor – Data Center Construction
Pay vs market
Salary: unknown
The company
Where to apply
Use the button above. It opens the posting on the employer's site.
Checked 2 h ago
About the job
Jobgether is hiring for the role of Senior Cost Manager / Quantity Surveyor – Data Center Construction. The role is remote, and the posting gives United States as the location. Our labels mark it as a senior-level role in skilled trades, construction and production. It asks for 5+ years of experience. The role includes some travel. A university degree is required. Jobgether has 1608 open positions on this site, 424 of them in IT and engineering.
Posted today · Last checked 2026-11-27
About Jobgether
1,608 open positions, 26% in IT and engineering. Most open roles: Marketing and communications (433), Finance and legal (367), Sales (360).
Similar jobs
Key facts
| Workplace | Remote |
| Seniority | Senior |
| Role | Skilled trades, construction and production |
| Countries | United States |
| Employment type | Full-time |
| Key facts | Experience: 5+ years · Degree required · Remote · Some travel |
The full description is on the original posting. Labels are set automatically and can be wrong. About the data
