Harlingen, Texas, United States
CONSTRUCTION SCHEDULER
Salary: unknownExcelProcurement
Nox Group, a company in manufacturing and hardware, has an open position for CONSTRUCTION SCHEDULER. The job is based in Harlingen, United States. We classify it under operations and admin. Nox Group has 15 open positions on this site, 1 of them in IT and engineering.
Posted 28 days ago · Last checked 2026-10-21
About Nox Group
Manufacturing and hardware Non-tech company with an IT team 15 open positions, 7% in IT and engineering. Most open roles: Skilled trades, construction and production (4), Non-software engineering and technicians (2), General management and executives (2).
Similar jobs
4,004 open operations and admin jobs in the United States
- Operations Lead — Comfrt, Bloomington, Minnesota
- Senior Associate, New Verticals - Central Strategy & Operations — DoorDash USA, New York, NY; Austin, TX; Chicago, IL; San Francisco, CA; Seattle, WA
- Deal Operations Analyst — Harvey, Dallas
- Staff Strategic Supply Chain Manager, PCB/PCBA — Anduril Industries, Costa Mesa, California, United States
- Director, Strategy & Operations (Site Performance) — Iterative Health, NYC, Cambridge or Dallas HQ
- Operations Associate (Day Shift) — Triumph, Fremont
- Operations Associate (Night Shift) — Triumph, Fremont
- Regional Director - U.S. Midwest Data Center Operations — CoreWeave, Caledonia, MI / Cincinnati, OH / Columbus, OH / Hammond, IN / Sandusky, OH
| Workplace | Workplace not stated |
| Seniority | Not stated |
| Role | Operations and admin |
| Countries | United States |
| Key facts | Tools: Excel |
The full description is on the original posting. Labels are set automatically and can be wrong. About the data