Sourcing Manager, Data Center Construction (Starlink)
SpaceX, a software company in business software (SaaS), has an open position for Sourcing Manager, Data Center Construction (Starlink). The job is based in Memphis, United States. Our labels mark it as a senior-level role in operations and admin. It asks for 5+ years of experience. The role includes some travel. SpaceX has 479 open positions on this site, 108 of them in IT and engineering.
Posted 4 days ago · Last checked 2026-10-21
About SpaceX
Business software (SaaS) Software product company 479 open positions, 23% in IT and engineering. Most open roles: Non-software engineering and technicians (157), Operations and admin (94), Software engineering (general) (63).
Similar jobs
3,981 open operations and admin jobs in the United States
- Rental Coordinator — EquipmentShare, Baltimore, MD
- Administrative Assistant (Monday-Friday) — One Medical, Sunnyvale, CA
- Senior Manager, Protective Operations — Crusoe, San Francisco, CA - US
- Phlebotomist / Administrative Assistant — One Medical, San Francisco, CA
- Administrative Assistant (Duboce Triangle) — One Medical, San Francisco, CA
- Phlebotomist / Administrative Assistant (West Portal) — One Medical, San Francisco, CA
- Phlebotomist / Administrative Assistant (Inner Sunset) — One Medical, San Francisco, CA
- Manager, Venue Planning & Operations — LA28 (Web), Los Angeles, California, United States
| Workplace | Workplace not stated |
| Seniority | Senior |
| Role | Operations and admin |
| Countries | United States |
| Key facts | Tools: Power BI · Experience: 5+ years · Some travel |
The full description is on the original posting. Labels are set automatically and can be wrong. About the data