Data Center Construction- Mid to Senior Project Manager
MGAC, a company in consulting, agencies and business services, is hiring for the role of Data Center Construction- Mid to Senior Project Manager. The posting gives Manassas, United States as the location. We classify it as a senior-level role in skilled trades, construction and production. Candidates need 5+ years of experience. There are 8 open positions from MGAC on this site.
Posted 16 days ago · Last checked 2026-10-20
About MGAC
Consulting, agencies and business services Non-tech company 8 open positions. Most open roles: Skilled trades, construction and production (9), Hospitality, food service and cleaning (1), Project and program management (1).
Similar jobs
1,867 open skilled trades, construction and production jobs in the United States
- Maintenance Supervisor in Training — Weinstein Properties, Charlotte, NC (South)
- CNC Machine Operator — Re:Build Manufacturing, Rock Hill, SC
- Quality Inspector Supervisor — Anduril Industries, Ashville, Ohio, United States
- Quality Inspector II ,4th Shift, Site 2 — AST SpaceMobile, Midland, Texas, United States
- Quality Inspector II, 2nd Shift, Site 2 — AST SpaceMobile, Midland, Texas, United States
- Production Progam Manager, Optics — Anduril Industries, Waltham, Massachusetts, United States
- Welding Inspector Specialist - Night Shift — SpaceX, Starbase, TX
- UAV Avionics Assembler IV — Zone 5 Technologies, San Luis Obispo, California
| Workplace | Workplace not stated |
| Seniority | Senior |
| Role | Skilled trades, construction and production |
| Countries | United States |
| Key facts | Experience: 5+ years |
The full description is on the original posting. Labels are set automatically and can be wrong. About the data