Project Schedule Manager / Construction Scheduler
Pay vs market
Salary: unknown
The company
Where to apply
Use the button above. It opens the posting on the employer's site.
Checked 28 min ago
About the job
SWJ TECHNOLOGY, LLC, a company in mobility and automotive, has an open position for Project Schedule Manager / Construction Scheduler. The job is based in United States. Our labels mark it as a mid-level role in operations and admin. SWJ TECHNOLOGY, LLC has 16 open positions on this site, 1 of them in IT and engineering.
Posted 5 days ago · Last checked 2026-11-28
About SWJ TECHNOLOGY, LLC
16 open positions, 6% in IT and engineering. Most open roles: Non-software engineering and technicians (5), Skilled trades, construction and production (4), Operations and admin (2).
Similar jobs
Key facts
| Workplace | Workplace not stated |
| Seniority | Mid |
| Role | Operations and admin |
| Countries | United States |
| Employment type | PART_TIME |
The full description is on the original posting. Labels are set automatically and can be wrong. About the data
