RoleFalcon
All jobsIT jobsBrowseCompaniesBlog
English
Dubai, United Arab Emirates

Data Center Construction Director(MEP)

The company

NAFFCO
27
open positions
All open jobs at NAFFCO

Where to apply

Use the button above. It opens the posting on the employer's site.

Checked 25 min ago

About the job

NAFFCO has an open position for Data Center Construction Director(MEP). The posting gives Dubai, United Arab Emirates as the location. We classify it under skilled trades, construction and production. Candidates need 15+ years of experience. There are 27 open positions from NAFFCO on this site, 2 of them in IT and engineering.

Posted 9 days ago · Last checked 2026-11-28

About NAFFCO

Non-tech company with an IT team

27 open positions, 7% in IT and engineering. Most open roles: Non-software engineering and technicians (10), Operations and admin (6), Sales (3).

Similar jobs

Key facts

WorkplaceWorkplace not stated
SeniorityStaff
RoleSkilled trades, construction and production
CountriesUnited Arab Emirates
Key factsExperience: 15+ years

The full description is on the original posting. Labels are set automatically and can be wrong. About the data