RoleFalcon
All jobsIT jobsBrowseCompaniesBlog
English
Richmond, United States

Director, Data Center Construction

Pay vs market

Salary: unknown

USD 167.5K
Market median of 24 jobs
Salaries for this role

The company

Overwatch
Real estate, construction and proptech
37
open positions
All open jobs at Overwatch

Where to apply

Use the button above. It opens the posting on the employer's site.

Checked 5 h ago

About the job

Overwatch, a company in real estate, construction and proptech, has an open position for Director, Data Center Construction. The role is on-site in Richmond, United States. We classify it under skilled trades, construction and production. The role includes up to 25% travel. Certifications named in the posting: PMP. Overwatch has 37 open positions on this site.

Posted 10 days ago · Last checked 2026-11-28

Tech stack

About Overwatch

Real estate, construction and proptechNon-tech company

37 open positions. Most open roles: Operations and admin (8), Non-software engineering and technicians (7), Project and program management (5).

Similar jobs

Key facts

WorkplaceOn-site
SeniorityStaff
RoleSkilled trades, construction and production
CountriesUnited States
Employment typefull_time
Key factsTools: Microsoft 365 · Certifications: PMP · Travel: 25% · Driving licence required

The full description is on the original posting. Labels are set automatically and can be wrong. About the data