RoleFalconAll jobsIT jobsBrowseCompaniesUpdated 2 min agoSign in

← back to results

San Francisco, CA - US

Senior Construction Scheduler, Data Center

USD 165K–210K / yearOn-siteSeniorPMPComplianceMS ProjectSmartsheet

Crusoe, a software company in developer tools and infrastructure, is hiring for the role of Senior Construction Scheduler, Data Center. The role is on-site in San Francisco, United States. Our labels mark it as a senior-level role in operations and admin. Perks named in the posting: equity. Certifications named in the posting: PMP. Crusoe has 109 open positions on this site, 33 of them in IT and engineering.

Posted 24 days ago · Last checked 2026-10-22

About Crusoe

Developer tools and infrastructure Software product company 109 open positions, 30% in IT and engineering. Most open roles: Software engineering (general) (30), Finance and legal (17), Non-software engineering and technicians (15).

All open jobs at Crusoe →

Similar jobs

3,877 open operations and admin jobs in the United States

WorkplaceOn-site
SenioritySenior
RoleOperations and admin
CountriesUnited States
Employment typeFullTime
Key factsCertifications: PMP · Equity

The full description is on the original posting. Labels are set automatically and can be wrong. About the data