RoleFalconAll jobsIT jobsBrowseCompaniesUpdated 1 min agoSign in

← back to results

Dallas, TX - US

HSE Manager, Data Center Construction

USD 129K–157K / yearOn-siteSeniorRoot cause analysis

HSE Manager, Data Center Construction is an open role at Crusoe, a software company in developer tools and infrastructure. The role is on-site in Dallas, United States. Our labels mark it as a senior-level role in security guards and safety. It asks for 7+ years of experience. Perks named in the posting: equity. The role includes up to 50% travel. Crusoe has 108 open positions on this site, 38 of them in IT and engineering.

Posted 26 days ago · Last checked 2026-10-21

About Crusoe

Developer tools and infrastructure Software product company 108 open positions, 35% in IT and engineering. Most open roles: Software engineering (general) (34), Finance and legal (18), Non-software engineering and technicians (14).

All open jobs at Crusoe →

Similar jobs

387 open security guards and safety jobs in the United States

WorkplaceOn-site
SenioritySenior
RoleSecurity guards and safety
CountriesUnited States
Employment typeFullTime
Key factsExperience: 7+ years · Travel: 50% · Equity

The full description is on the original posting. Labels are set automatically and can be wrong. About the data