RoleFalcon
All jobsIT jobsBrowseCompaniesBlog
English
Livingston, NJ / New York, NY / Sunnyvale, CA / San Francisco, CA / Bellevue, WA

Data Center Construction Scheduler

USD 157K–210K / yearOperations and admin

Pay vs market

USD 90K104% above the market
Market median of 2,262 jobs
Salaries for this role

The company

CoreWeave
AI and data
73+26% in 30 days
open positions
All open jobs at CoreWeave

Where to apply

Use the button above. It opens the posting on the employer's site.

Checked 4 h ago

About the job

Data Center Construction Scheduler is an open role at CoreWeave, a software company in AI and data. The posting gives Livingston, United States as the location. We classify it under operations and admin. Certifications named in the posting: PMP. There are 73 open positions from CoreWeave on this site, 25 of them in IT and engineering.

Posted 17 days ago · Last checked 2026-11-28

Tech stack

About CoreWeave

AI and dataSoftware product company

73 open positions, 34% in IT and engineering. Most open roles: Software engineering (general) (18), Operations and admin (15), Non-software engineering and technicians (9).

Similar jobs

Key facts

WorkplaceWorkplace not stated
SeniorityNot stated
RoleOperations and admin
CountriesUnited States
Key factsTools: Microsoft 365 · Certifications: PMP

The full description is on the original posting. Labels are set automatically and can be wrong. About the data