# Construction Scheduler | Mission Critical

- **Company:** Sargent Electric
- **Location:** Pittsburgh, PA
- **Workplace:** Workplace not stated
- **Salary:** Salary: unknown
- **Seniority:** Not stated
- **Role:** Operations and admin
- **Countries:** United States
- **Employment type:** FULL_TIME
- **Posted:** 2026-11-02
- **Job page:** https://rolefalcon.com/job/75300516-construction-scheduler-mission-critical-sargent-electric-pittsburgh

Sargent Electric, a company in energy and climate, is hiring for the role of Construction Scheduler | Mission Critical. The job is based in Pittsburgh, United States. We classify it under operations and admin. Sargent Electric has 7 open positions on this site, 1 of them in IT and engineering.

To apply, open the job page above and follow its Apply link to the original posting.

## Similar jobs

- [Assisted Living Resident Assistant /Aide](https://rolefalcon.com/job/214850027-assisted-living-resident-assistant-aide-otterbein-seniorlife-west-liberty) — Otterbein SeniorLife
- [Household Assistant](https://rolefalcon.com/job/214748430-household-assistant-otterbein-seniorlife-gahanna) — Otterbein SeniorLife
- [Strategic Operations Intern](https://rolefalcon.com/job/214773828-strategic-operations-intern-clera-new-york) — Clera
- [Strategy & Operations Working Student](https://rolefalcon.com/job/214773826-strategy-operations-working-student-clera-san-francisco) — Clera
- [Resident Assistant ](https://rolefalcon.com/job/214748470-resident-assistant-otterbein-seniorlife-franklin) — Otterbein SeniorLife
- [Remote Part-Time - Protection Planning Specialist](https://rolefalcon.com/job/213744147-remote-part-time-protection-planning-specialist-ao-garcia-agency-wauwatosa) — AO Garcia Agency
- [Protection Planning Specialist - Remote](https://rolefalcon.com/job/213743364-protection-planning-specialist-remote-ao-garcia-agency-harrisonburg) — AO Garcia Agency
- [Remote - Protection Planning Specialist](https://rolefalcon.com/job/213743936-remote-protection-planning-specialist-ao-garcia-agency-box-elder) — AO Garcia Agency
