# Accenture Construct – Project Manager, Data Center Construction, ANS

- **Company:** Accenture Infrastructure and Capital Projects, LLC
- **Location:** Nationwide
- **Workplace:** Hybrid
- **Salary:** Salary: unknown
- **Seniority:** Mid
- **Role:** Skilled trades, construction and production
- **Countries:** Belgium
- **Employment type:** full-time
- **Posted:** 2026-10-22
- **Key facts:** Experience: 4+ years; Degree required; Some travel
- **Job page:** https://rolefalcon.com/job/62292565-accenture-construct-project-manager-data-center-construction-ans-accenture

Accenture Infrastructure and Capital Projects, LLC, a company in energy and climate, has an open position for Accenture Construct – Project Manager, Data Center Construction, ANS. It is a hybrid position in Ans, Belgium. We classify it as a mid-level role in skilled trades, construction and production. Candidates need 4+ years of experience. The role includes some travel. A university degree is required. There are 40 open positions from Accenture Infrastructure and Capital Projects, LLC on this site, 1 of them in IT and engineering.

To apply, open the job page above and follow its Apply link to the original posting.

## Similar jobs

- [QC Analyst Talent Pool](https://rolefalcon.com/job/49882071-qc-analyst-talent-pool-legend-biotech-eu-belgium) — Legend Biotech EU
- [Production Operator](https://rolefalcon.com/job/50122741-production-operator-smappee-harelbeke) — Smappee
- [Servicetechniker SHK (m/w/d) Wärmepumpen & Heiztechnik - 1KOMMA5° Handwerk - Deutschlandweit](https://rolefalcon.com/job/1498045-servicetechniker-shk-m-w-d-warmepumpen-heiztechnik-1komma5-handwerk) — 1KOMMA5
