# Accenture Construct - Data Center Construction Project Manager - Brazil, ANS

- **Company:** Accenture Infrastructure and Capital Projects, LLC
- **Location:** Campinas, Sao Paulo
- **Workplace:** On-site
- **Salary:** Salary: unknown
- **Seniority:** Senior
- **Role:** Skilled trades, construction and production
- **Countries:** Brazil
- **Employment type:** full-time
- **Posted:** 2026-10-20
- **Key facts:** Experience: 7+ years
- **Job page:** https://rolefalcon.com/job/62292543-accenture-construct-data-center-construction-project-manager-brazil-ans

Accenture Infrastructure and Capital Projects, LLC, a company in energy and climate, is hiring for the role of Accenture Construct - Data Center Construction Project Manager - Brazil, ANS. The work is on-site in Campinas, Brazil. We classify it as a senior-level role in skilled trades, construction and production. Candidates need 7+ years of experience. There are 40 open positions from Accenture Infrastructure and Capital Projects, LLC on this site, 1 of them in IT and engineering.

To apply, open the job page above and follow its Apply link to the original posting.

## Similar jobs

- [Packaging Designer](https://rolefalcon.com/job/62294963-packaging-designer-jobgether-brazil) — Jobgether
- [License Owner / Operator, Sao Paulo](https://rolefalcon.com/job/60184853-license-owner-operator-sao-paulo-stranger-soccer-sao-paulo) — Stranger Soccer
- [Production Supervisor](https://rolefalcon.com/job/55688418-production-supervisor-bw-energy-rio-de-janeiro) — BW Energy
- [Production Superintendent](https://rolefalcon.com/job/55688417-production-superintendent-bw-energy-rio-de-janeiro) — BW Energy
- [Control Room Operator](https://rolefalcon.com/job/55688412-control-room-operator-bw-energy-rio-de-janeiro) — BW Energy
- [Construction Project Coordinator](https://rolefalcon.com/job/50269255-construction-project-coordinator-pavago-brazil-colombia-mexico-costa-rica) — Pavago
- [Pre-Construction Job Coordinator / Estimator (Residential - high end)](https://rolefalcon.com/job/15882252-pre-construction-job-coordinator-estimator-residential-high-end-agent-brazil-el) — Agent
- [Senior Production Designer - Advertising](https://rolefalcon.com/job/9587-senior-production-designer-advertising-truelogic-sao-paulo) — Truelogic
