# Senior Mechanical Commissioning Project Engineer-Data Center Construction

- **Company:** FST Technical Services
- **Location:** Chicago, IL
- **Workplace:** Workplace not stated
- **Salary:** USD 150K–170K / year
- **Seniority:** Senior
- **Role:** Non-software engineering and technicians
- **Countries:** United States
- **Employment type:** FULL_TIME
- **Posted:** 2026-10-19
- **Key facts:** Experience: 7+ years; Visa sponsorship: no
- **Job page:** https://rolefalcon.com/job/56996380-senior-mechanical-commissioning-project-engineer-data-center-construction-fst

FST Technical Services, a company in manufacturing and hardware, has an open position for Senior Mechanical Commissioning Project Engineer-Data Center Construction. The job is based in Chicago, United States. Our labels mark it as a senior-level role in non-software engineering and technicians. It asks for 7+ years of experience. Visa sponsorship is not offered. FST Technical Services has 19 open positions on this site.

To apply, open the job page above and follow its Apply link to the original posting.

## Similar jobs

- [Propulsion Responsible Engineer II, Combustion Devices ](https://rolefalcon.com/job/144157518-propulsion-responsible-engineer-ii-combustion-devices-relativity-space-long) — Relativity Space
- [Senior Robotics Software Engineer](https://rolefalcon.com/job/143591815-senior-robotics-software-engineer-clera-san-francisco) — Clera
- [Senior Mechanical Engineer](https://rolefalcon.com/job/143468712-senior-mechanical-engineer-clera-detroit) — Clera
- [Forward Deployed Engineer](https://rolefalcon.com/job/143341357-forward-deployed-engineer-overjet-san-mateo) — Overjet
- [Senior Electrical Engineer](https://rolefalcon.com/job/455317-senior-electrical-engineer-rainmaker-el-segundo) — rainmaker
- [Electrical Engineer](https://rolefalcon.com/job/455312-electrical-engineer-rainmaker-el-segundo) — rainmaker
- [Senior Mechanical Engineer](https://rolefalcon.com/job/455311-senior-mechanical-engineer-rainmaker-el-segundo) — rainmaker
- [Lead, UAV Integration Technician](https://rolefalcon.com/job/455316-lead-uav-integration-technician-rainmaker-el-segundo) — rainmaker
