# Data Center Construction- Mid to Senior Project Manager (ML Racks/Low Voltage)

- **Company:** MGAC
- **Location:** Indianapolis, IN
- **Workplace:** Workplace not stated
- **Salary:** USD 100K–150K / year
- **Seniority:** Senior
- **Role:** Skilled trades, construction and production
- **Countries:** United States
- **Posted:** 2026-10-24
- **Key facts:** Experience: 3+ years
- **Job page:** https://rolefalcon.com/job/29493727-data-center-construction-mid-to-senior-project-manager-ml-racks-low-voltage

MGAC, a company in consulting, agencies and business services, has an open position for Data Center Construction- Mid to Senior Project Manager (ML Racks/Low Voltage). The posting gives Indianapolis, United States as the location. We classify it as a senior-level role in skilled trades, construction and production. Candidates need 3+ years of experience. There are 10 open positions from MGAC on this site.

To apply, open the job page above and follow its Apply link to the original posting.

## Similar jobs

- [Telematics Installer ](https://rolefalcon.com/job/46071732-telematics-installer-equipmentshare-bridgeport) — EquipmentShare
- [Facility Operator](https://rolefalcon.com/job/101656-facility-operator-fluidstack-river-bend) — Fluidstack
- [Finished Goods Operator - 3rd Shift](https://rolefalcon.com/job/45505760-finished-goods-operator-3rd-shift-monster-energy-usa-phoenix) — Monster Energy
- [Sr. Manager, Game Production - VALORANT, Maps](https://rolefalcon.com/job/45507085-sr-manager-game-production-valorant-maps-riot-games-los-angeles) — Riot Games
- [Electrician](https://rolefalcon.com/job/45437416-electrician-formenergy-berkeley) — Formenergy
- [Equipment Operator](https://rolefalcon.com/job/45226013-equipment-operator-sanmar-internal-avondale) — SanMar-Internal 
- [Production Coordinator](https://rolefalcon.com/job/45226912-production-coordinator-anysignal-los-angeles) — AnySignal
- [Groundskeeper](https://rolefalcon.com/job/45156687-groundskeeper-weinstein-properties-north-austin) — Weinstein Properties
