# Data Center Construction- Mid to Senior  Project Manager

- **Company:** MGAC
- **Location:** Terre Haute, IN
- **Workplace:** Workplace not stated
- **Salary:** USD 120K–160K / year
- **Seniority:** Senior
- **Role:** Skilled trades, construction and production
- **Countries:** United States
- **Posted:** 2026-10-24
- **Key facts:** Experience: 5+ years
- **Job page:** https://rolefalcon.com/job/29493723-data-center-construction-mid-to-senior-project-manager-mgac-terre-haute

MGAC, a company in consulting, agencies and business services, is hiring for the role of Data Center Construction- Mid to Senior Project Manager. The posting gives Terre Haute, United States as the location. We classify it as a senior-level role in skilled trades, construction and production. Candidates need 5+ years of experience. There are 12 open positions from MGAC on this site.

To apply, open the job page above and follow its Apply link to the original posting.

## Similar jobs

- [Shop Mechanic](https://rolefalcon.com/job/53855430-shop-mechanic-michels-corporation-neenah) — Michels Corporation
- [Inspector- Mi-Tech Services, Inc.](https://rolefalcon.com/job/53855353-inspector-mi-tech-services-inc-michels-corporation-brownsville) — Michels Corporation
- [Auto Mechanic II - ADESA Mira Loma](https://rolefalcon.com/job/53562676-auto-mechanic-ii-adesa-mira-loma-carvana-mira-loma) — Carvana
- [Auto Mechanic II - ADESA Mira Loma](https://rolefalcon.com/job/53526838-auto-mechanic-ii-adesa-mira-loma-adesa-mira-loma) — ADESA
- [Sr. Quality Inspector II](https://rolefalcon.com/job/53372274-sr-quality-inspector-ii-ddn-chatsworth-office) — DDN
- [Senior Quality Inspector II](https://rolefalcon.com/job/53372273-senior-quality-inspector-ii-ddn-chatsworth-office) — DDN
- [Traveling Superintendent (Cold Storage)](https://rolefalcon.com/job/52073544-traveling-superintendent-cold-storage-catamount-constructors-ft-pierce) — Catamount Constructors
- [Quality Assurance Inspector ](https://rolefalcon.com/job/51045434-quality-assurance-inspector-ast-spacemobile-midland) — AST SpaceMobile
