# Data Center Construction- Mid to Senior  Project Manager

- **Company:** MGAC
- **Location:** Ashville, OH 
- **Workplace:** Workplace not stated
- **Salary:** USD 120K–160K / year
- **Seniority:** Senior
- **Role:** Skilled trades, construction and production
- **Countries:** United States
- **Posted:** 2026-10-23
- **Key facts:** Experience: 5+ years
- **Job page:** https://rolefalcon.com/job/22816218-data-center-construction-mid-to-senior-project-manager-mgac-ashville

MGAC, a company in consulting, agencies and business services, is hiring for the role of Data Center Construction- Mid to Senior Project Manager. The job is based in United States. Our labels mark it as a senior-level role in skilled trades, construction and production. It asks for 5+ years of experience. MGAC has 12 open positions on this site.

To apply, open the job page above and follow its Apply link to the original posting.

## Similar jobs

- [Quality Assurance Inspector ](https://rolefalcon.com/job/51045434-quality-assurance-inspector-ast-spacemobile-midland) — AST SpaceMobile
- [Quality Inspector II, 3rd Shift, Site 2](https://rolefalcon.com/job/51006237-quality-inspector-ii-3rd-shift-site-2-ast-spacemobile-midland) — AST SpaceMobile
- [Director Production Management](https://rolefalcon.com/job/50876581-director-production-management-sphere-entertainment-group-llc-burbank) — Sphere Entertainment Group, LLC
- [Maintenance Supervisor](https://rolefalcon.com/job/50505088-maintenance-supervisor-weinstein-properties-grand-prairie) — Weinstein Properties
- [Process Operator Specialist, Air Separation Unit (Starship) - Night Shift](https://rolefalcon.com/job/50443112-process-operator-specialist-air-separation-unit-starship-night-shift-spacex) — SpaceX
- [Process Operator Specialist, Air Separation Unit (Starship) - Level 4/5 - Night Shift](https://rolefalcon.com/job/50385265-process-operator-specialist-air-separation-unit-starship-level-4-5-night-shift) — SpaceX
- [Production Manager - Seattle](https://rolefalcon.com/job/50389902-production-manager-seattle-carvana-auburn) — Carvana
- [Skilled Auto Mechanic - (1st Shift) - Bonus Opportunity ($6,000)](https://rolefalcon.com/job/50390011-skilled-auto-mechanic-1st-shift-bonus-opportunity-6-000-carvana-framingham) — Carvana
