# Senior Cost Manager / Quantity Surveyor – Data Center Construction

- **Company:** Jobgether
- **Location:** US
- **Workplace:** Remote
- **Salary:** Salary: unknown
- **Seniority:** Senior
- **Role:** Skilled trades, construction and production
- **Countries:** United States
- **Employment type:** Full-time
- **Posted:** 2026-11-27
- **Key facts:** Experience: 5+ years; Degree required; Remote; Some travel
- **Job page:** https://rolefalcon.com/job/203216214-senior-cost-manager-quantity-surveyor-data-center-construction-jobgether-us

Jobgether is hiring for the role of Senior Cost Manager / Quantity Surveyor – Data Center Construction. The role is remote, and the posting gives United States as the location. Our labels mark it as a senior-level role in skilled trades, construction and production. It asks for 5+ years of experience. The role includes some travel. A university degree is required. Jobgether has 1765 open positions on this site, 454 of them in IT and engineering.

To apply, open the job page above and follow its Apply link to the original posting.

## Similar jobs

- [Lead Auto Painter ($6,000 Bonus) - Rio Linda, CA](https://rolefalcon.com/job/205451660-lead-auto-painter-6-000-bonus-rio-linda-ca-carvana-rio-linda) — Carvana
- [Entry-Level Automotive Detailer / Lot Attendant Post Production](https://rolefalcon.com/job/205214191-entry-level-automotive-detailer-lot-attendant-post-production-carvana-syracuse) — Carvana
- [Diesel Mechanic](https://rolefalcon.com/job/205050001-diesel-mechanic-equipmentshare-greenville) — EquipmentShare
- [Shop Mechanic C](https://rolefalcon.com/job/205050540-shop-mechanic-c-equipmentshare-wilmington) — EquipmentShare
- [Mobile Mechanic](https://rolefalcon.com/job/205050414-mobile-mechanic-equipmentshare-columbus) — EquipmentShare
- [Road Mechanic](https://rolefalcon.com/job/204913216-road-mechanic-equipmentshare-montgomery) — EquipmentShare
- [Certified Welding Inspector (CWI)](https://rolefalcon.com/job/205377526-certified-welding-inspector-cwi-geotek-operations-limited-las-vegas) — GeoTek Operations Limited
- [ICC Special Inspector](https://rolefalcon.com/job/205377531-icc-special-inspector-geotek-operations-limited-albuquerque) — GeoTek Operations Limited
