# Data Center Construction- Mid to Senior  Project Manager

- **Company:** MGAC
- **Location:** Forsyth, GA
- **Workplace:** Workplace not stated
- **Salary:** USD 120K–160K / year
- **Seniority:** Senior
- **Role:** Skilled trades, construction and production
- **Countries:** United States
- **Posted:** 2026-11-25
- **Key facts:** Experience: 5+ years
- **Job page:** https://rolefalcon.com/job/195887759-data-center-construction-mid-to-senior-project-manager-mgac-forsyth

Data Center Construction- Mid to Senior Project Manager is an open role at MGAC, a company in consulting, agencies and business services. The posting gives United States as the location. We classify it as a senior-level role in skilled trades, construction and production. Candidates need 5+ years of experience. There are 7 open positions from MGAC on this site.

To apply, open the job page above and follow its Apply link to the original posting.

## Similar jobs

- [Forming Cell Operator](https://rolefalcon.com/job/209914370-forming-cell-operator-machina-labs-chatsworth) — Machina Labs
- [Production Supervisor - Weekend First Shift](https://rolefalcon.com/job/207864648-production-supervisor-weekend-first-shift-nox-metals-detroit) — NOX METALS
- [Lead Auto Painter ($6,000 Bonus) - Rio Linda, CA](https://rolefalcon.com/job/205451660-lead-auto-painter-6-000-bonus-rio-linda-ca-carvana-rio-linda) — Carvana
- [Entry-Level Automotive Detailer / Lot Attendant Post Production](https://rolefalcon.com/job/205214191-entry-level-automotive-detailer-lot-attendant-post-production-carvana-syracuse) — Carvana
- [Technologist, Chip Packaging](https://rolefalcon.com/job/205717375-technologist-chip-packaging-diamond-foundry-bay-area) — Diamond Foundry
- [Diesel Mechanic](https://rolefalcon.com/job/205050001-diesel-mechanic-equipmentshare-greenville) — EquipmentShare
- [Shop Mechanic C](https://rolefalcon.com/job/205050540-shop-mechanic-c-equipmentshare-wilmington) — EquipmentShare
- [Mobile Mechanic](https://rolefalcon.com/job/205050414-mobile-mechanic-equipmentshare-columbus) — EquipmentShare
