# Data Center Construction Director(MEP)

- **Company:** NAFFCO
- **Location:** Dubai, United Arab Emirates
- **Workplace:** Workplace not stated
- **Salary:** Salary: unknown
- **Seniority:** Staff
- **Role:** Skilled trades, construction and production
- **Countries:** United Arab Emirates
- **Posted:** 2026-11-19
- **Key facts:** Experience: 15+ years
- **Job page:** https://rolefalcon.com/job/167438161-data-center-construction-director-mep-naffco-dubai

NAFFCO has an open position for Data Center Construction Director(MEP). The posting gives Dubai, United Arab Emirates as the location. We classify it under skilled trades, construction and production. Candidates need 15+ years of experience. There are 27 open positions from NAFFCO on this site, 2 of them in IT and engineering.

To apply, open the job page above and follow its Apply link to the original posting.

## Similar jobs

- [Producer (Video Production)](https://rolefalcon.com/job/194798727-producer-video-production-jobgether-united-arab-emirates) — Jobgether
- [Gas system inspectors](https://rolefalcon.com/job/195213603-gas-system-inspectors-blackstone-eit-abu-dhabi) — BlackStone eIT
- [Event Floor Plan Inspector/AutoCAD Detailer (4 Months Contract)](https://rolefalcon.com/job/192534975-event-floor-plan-inspector-autocad-detailer-4-months-contract-experts-plus) — Experts Plus Recruitment Services
- [Post Production Artist - Fixed Term](https://rolefalcon.com/job/186822779-post-production-artist-fixed-term-huda-beauty-dubai) — Huda Beauty
- [CA with 2 yrs of post qual. exp. in Construction & Real Estate Exp](https://rolefalcon.com/job/173742064-ca-with-2-yrs-of-post-qual-exp-in-construction-real-estate-exp-meraki) — Meraki Integrated Contracting LLC
- [Senior Associate, Construction Quantum](https://rolefalcon.com/job/170177745-senior-associate-construction-quantum-secretariat-dubai) — Secretariat 
- [Land Surveyor](https://rolefalcon.com/job/164175548-land-surveyor-mira-l-l-c-dubai) — MIRA L.L.C
- [R&D and Innovation Packaging Manager](https://rolefalcon.com/job/160094275-r-d-and-innovation-packaging-manager-huda-beauty-dubai) — Huda Beauty
