# Director, Data Center Construction

- **Company:** Overwatch
- **Location:** Richmond, United States
- **Workplace:** On-site
- **Salary:** Salary: unknown
- **Seniority:** Staff
- **Role:** Skilled trades, construction and production
- **Countries:** United States
- **Employment type:** full_time
- **Posted:** 2026-11-17
- **Key facts:** Tools: Microsoft 365; Certifications: PMP; Travel: 25%; Driving licence required
- **Job page:** https://rolefalcon.com/job/160635052-director-data-center-construction-overwatch-richmond

Overwatch, a company in real estate, construction and proptech, has an open position for Director, Data Center Construction. The role is on-site in Richmond, United States. We classify it under skilled trades, construction and production. The role includes up to 25% travel. Certifications named in the posting: PMP. Overwatch has 37 open positions on this site.

To apply, open the job page above and follow its Apply link to the original posting.

## Similar jobs

- [Production Supervisor - Weekend First Shift](https://rolefalcon.com/job/207864648-production-supervisor-weekend-first-shift-nox-metals-detroit) — NOX METALS
- [Lead Auto Painter ($6,000 Bonus) - Rio Linda, CA](https://rolefalcon.com/job/205451660-lead-auto-painter-6-000-bonus-rio-linda-ca-carvana-rio-linda) — Carvana
- [Entry-Level Automotive Detailer / Lot Attendant Post Production](https://rolefalcon.com/job/205214191-entry-level-automotive-detailer-lot-attendant-post-production-carvana-syracuse) — Carvana
- [Technologist, Chip Packaging](https://rolefalcon.com/job/205717375-technologist-chip-packaging-diamond-foundry-bay-area) — Diamond Foundry
- [Diesel Mechanic](https://rolefalcon.com/job/205050001-diesel-mechanic-equipmentshare-greenville) — EquipmentShare
- [Shop Mechanic C](https://rolefalcon.com/job/205050540-shop-mechanic-c-equipmentshare-wilmington) — EquipmentShare
- [Mobile Mechanic](https://rolefalcon.com/job/205050414-mobile-mechanic-equipmentshare-columbus) — EquipmentShare
- [Road Mechanic](https://rolefalcon.com/job/204913216-road-mechanic-equipmentshare-montgomery) — EquipmentShare
