# Data Center Construction - Junior to Mid Project Manager (Cost)

- **Company:** MGAC
- **Location:** Franklin Furnace, OH
- **Workplace:** Workplace not stated
- **Salary:** USD 110K–140K / year
- **Seniority:** Entry
- **Role:** Skilled trades, construction and production
- **Countries:** United States
- **Posted:** 2026-11-13
- **Key facts:** Experience: 3+ years
- **Job page:** https://rolefalcon.com/job/139884163-data-center-construction-junior-to-mid-project-manager-cost-mgac-franklin

MGAC, a company in consulting, agencies and business services, has an open position for Data Center Construction - Junior to Mid Project Manager (Cost). The posting gives United States as the location. We classify it under skilled trades, construction and production. Candidates need 3+ years of experience. There are 10 open positions from MGAC on this site.

To apply, open the job page above and follow its Apply link to the original posting.

## Similar jobs

- [Maintenance Supervisor-Sand Canyon Villas](https://rolefalcon.com/job/140374929-maintenance-supervisor-sand-canyon-villas-brighthaven-santa-clarita) — Brighthaven
- [Maintenance Supervisor-Sand Canyon Villas](https://rolefalcon.com/job/140386979-maintenance-supervisor-sand-canyon-villas-avanath-santa-clarita) — Avanath 
- [Lead Design CNC Programmer/Operator](https://rolefalcon.com/job/140211346-lead-design-cnc-programmer-operator-lucid-motors-newark) — Lucid Motors
- [Maintenance Supervisor](https://rolefalcon.com/job/140232043-maintenance-supervisor-avanath-oakland) — Avanath 
- [Construction Inspector ](https://rolefalcon.com/job/141274137-construction-inspector-luster-national-washington) — Luster National
- [Vehicle Inspector ](https://rolefalcon.com/job/139979339-vehicle-inspector-carvana-plainfield) — Carvana
- [Vehicle Inspector ](https://rolefalcon.com/job/140048235-vehicle-inspector-adesa-plainfield) — ADESA
- [License Owner & Operator, Dallas](https://rolefalcon.com/job/142836281-license-owner-operator-dallas-stranger-soccer-dallas) — Stranger Soccer
