# Data Center Construction Manager

- **Company:** Armada
- **Location:** Australia (Remote)
- **Workplace:** Remote
- **Salary:** Salary: unknown
- **Seniority:** Senior
- **Role:** Skilled trades, construction and production
- **Countries:** Australia
- **Posted:** 2026-11-10
- **Key facts:** Experience: 8+ years; Certifications: PMP; Remote; Schedule: weekends
- **Job page:** https://rolefalcon.com/job/124717996-data-center-construction-manager-armada-australia-remote

Armada, a software company in developer tools and infrastructure, has an open position for Data Center Construction Manager. The role is remote, and the posting gives Australia as the location. Our labels mark it as a senior-level role in skilled trades, construction and production. It asks for 8+ years of experience. Certifications named in the posting: PMP. Armada has 8 open positions on this site, 2 of them in IT and engineering.

To apply, open the job page above and follow its Apply link to the original posting.

## Similar jobs

- [Construction Manager](https://rolefalcon.com/job/203844730-construction-manager-jobgether-netherlands) — Jobgether
- [Associate Director - Cost Manager / Quantity Surveyor – Construction](https://rolefalcon.com/job/203213543-associate-director-cost-manager-quantity-surveyor-construction-jobgether-us) — Jobgether
- [Senior Cost Manager / Quantity Surveyor – Data Center Construction](https://rolefalcon.com/job/203216214-senior-cost-manager-quantity-surveyor-data-center-construction-jobgether-us) — Jobgether
- [Lead Estimator (014-1547)](https://rolefalcon.com/job/201790922-lead-estimator-014-1547-hunt-st-philippines) — Hunt St
- [Project Coordinator with Construction Experience for a US based Company | Remote](https://rolefalcon.com/job/60435444-project-coordinator-with-construction-experience-for-a-us-based-company-remote) — Paired
- [(Eerste) Monteur Elektrotechniek | Projectlocaties Randstad](https://rolefalcon.com/job/201203831-eerste-monteur-elektrotechniek-projectlocaties-randstad-vdk-groep-b-v-benschop) — VDK Groep B.V.
- [Industrial Plant Reliability & Maintenance Expert, AI Evaluation](https://rolefalcon.com/job/200493954-industrial-plant-reliability-maintenance-expert-ai-evaluation-clera-remote) — Clera
- [Elektroingenieur (m/w/d)](https://rolefalcon.com/job/200094459-elektroingenieur-m-w-d-angeheuert-gmbh-fohren) — ANGEHEUERT GmbH
